Now we will begin the final electrical and plumbing. We also have
finalized all the fabrics for upholstery and counter tops. Mike
I've got you back, on that blue bedspread!
|

The bed frame is ready to go to Jackson Mattress Factory for a
new custom mattress.
|

The door frame is installed very cool!
|

The bath clothes hamper is complete.
|

The new boomerang counter tops are installed.
|

The new tank monitor is installed and hooked up - Great job, James.
|

Here the new black holding tank is installed, wait a minute this
this is the white tank!
|

The refrigerator is all trimmed out, looks great.
|

One of the new 12 volt lamps installed.
|

The new curtains are just waiting for their Big Day!
|

Final detail to the bathroom done.
|

One of the new Boomerang counter tops installed.
|

Here new insulation is installed.
|

Original under belly being installed and reinforced with 1/8"
x 3/4" aluminum bar stock to keep from pulling from frame.
|

New aluminum lower skin being installed by James.
|

Here James is trying out the new welder, fabricating the rear
bumper (James loves to weld stuff!).
|

Here we are polishing the skin, what a shine!
|

Here the new wheel assemblies are installed.
|
|